11Troubleshooting, shortcuts and glossary

This chapter gives solutions to frequent problems, the keyboard shortcuts, and the definitions of the terms in this manual.

Troubleshooting

ProblemPossible causeSolution
Stratum 4D cannot open a Microsoft Project file.The file is an .mpp file.In Microsoft Project, save the file as XML. Then import the XML file.
The dates are different from the dates in P6.The schedule options are different.Click Project › Schedule…, then Options…. Set the same options as in P6. Read the log with View Log.
Stratum 4D does not save, and shows Save as new.A different person saved the project after you opened it.Click Save as new. Then compare the two versions.
A widget shows Needs a baseline.A prerequisite of the dashboard is not complete.Read the bar at the top of the dashboard. Do the step that it shows, for example assign a baseline.
A scheduled email was not sent.The desktop application was closed, or the mail server is not set.Start the desktop application. Set the mail server in Settings › Email. Look at the result of the last send on the schedule.
Elements of the model do not show during the simulation.The elements have no link to an activity.On the Display tab, look at Unlinked elements. Link them with a rule or by hand.
Explode By storey does not move the model.The elements have no Storey property.Select From centre, or add the Storey property to the IFC model.
Split Task does not split the task.You clicked near an end of the bar, or in its completed part.Click inside the bar, away from its ends and after its progress.
A section plane removes almost all of the model.The position is a fraction of the full height, and the model has deep foundations.Move the slider, or click ⇄ to keep the other side.
The exported video is slower or shorter than the animation.The computer cannot draw the frames at the frame rate.Use a lower resolution or frame rate. Or export a series of images and join them with a video editor.
The assistant does not show the Stratum tools.The configuration is incorrect, or the assistant application did not start again.Do a check of the path in the configuration. Make sure that Node.js 20 or newer is installed. Start the assistant application again.
The MCP server cannot open the database.sql-wasm.wasm is not in the folder of stratum-mcp.cjs, or the path is incorrect.Put the two files in the same folder. To use a different database file, set STRATUM_DB.
The sign-in page shows Too many wrong passwords.Stratum Server locked the sign-in after incorrect passwords.Wait for the time on the page. Then sign in with the correct password. If you do not know the password, ask the administrator for a new one.
Stratum 4D shows Your session ended.An administrator changed your password or your role.Sign in again.
The status bar shows Sent for approval, and P6 does not change.The server keeps updates to P6 until an administrator approves them.Ask an administrator to approve the request in Settings › Security.
Verify the log shows a red line.A person changed or removed audit entries in the database.Do not change the database. Tell your security team. Keep a copy of the database and of the server log.
The AiSOC tab shows Cannot reach AiSOC.The ingest address is incorrect, or AiSOC is stopped.Do a check of the address and the port (8081). Start AiSOC. Click Send waiting events now.
AiSOC refuses the events (HTTP 401).The push token is incorrect or old.Make a new token in AiSOC. Type it on the AiSOC tab and click Save.
The assistant says that a file is outside the folders.STRATUM_MCP_ROOTS does not include the folder of the file.Move the file into a permitted folder, or add the folder to STRATUM_MCP_ROOTS.

Keyboard shortcuts

All layouts

KeysAction
Ctrl+Alt+1P6 layout
Ctrl+Alt+2Project layout
Ctrl+Alt+34D layout
Ctrl+Alt+4Reports view
Ctrl+SSave the project
Ctrl+Z / Ctrl+YUndo / redo

P6 layout

KeysAction
Ctrl+OOpen
Ctrl+PPrint
Ins / DelAdd / delete an activity
Ctrl+LLink the selected activities
Ctrl+EFill down
Ctrl+FFind
Ctrl+ASelect all
F9Schedule
F10Level resources

Project layout

KeysAction
Shift+F2Task Information
Ctrl+F2Link the selected tasks
Ctrl+Shift+F2Unlink the selected tasks
Alt+Shift+→Indent
Alt+Shift+←Outdent
Alt+F10Assign Resources
F2, Enter, TabChange a cell, then go to the next cell

4D layout

KeysAction
SpacePlay or pause the simulation
Ctrl+Shift+ALink the selected elements to the selected activity
DelIn the animation editor: remove the selected key

Glossary

TermMeaning
ActivityOne item of work in the schedule. Microsoft Project calls it a task.
AiSOCAn open-source security operations center. Stratum Server can send its audit events to it.
ApprovalThe decision of an administrator to let an update go to P6
Audit logThe list of all sign-ins and changes on a Stratum Server. Each entry contains a fingerprint of the entry before it.
Appearance profileThe colors and visibility of an element before, during and after its activity
BaselineA copy of the schedule at one time. You compare the current schedule with it.
BEIBaseline Execution Index. The number of activities that finished, divided by the number that had to finish by the data date.
Critical activityAn activity that has no total float, or less float than the limit in the schedule options. A delay to it delays the project finish.
Data dateThe date of the progress. Work before it is actual, and work after it is forecast.
DCMA 14-point checkA set of 14 checks of the quality of a schedule, from the US Defense Contract Management Agency
ElementOne object of the 3D model, for example a wall or a transformer
Fingerprint (SHA-256)A short code that a calculation makes from data. A change to the data gives a different code.
Key (animation)A record of the camera, the date or the view at one time of an animation
IFCIndustry Foundation Classes. An open file format for building models.
Link (4D)A connection between an element and an activity
MCPModel Context Protocol. A standard that lets an AI assistant use tools.
MSPDIThe XML file format of Microsoft Project
RelationshipThe logic between two activities: Finish to Start (FS), Start to Start (SS), Finish to Finish (FF) or Start to Finish (SF), with a lag
Planned vs actualA color mode that compares the progress on the current dates with the progress on the baseline dates
Push tokenThe secret code that lets Stratum Server send events to AiSOC
Rule (4D)An instruction that links each element to the activity that has the same value
S-curveA chart of the cumulative cost, hours or progress against time
Section planeA plane that cuts the model and removes one side of it
SlicerA filter on a dashboard. It applies to all the widgets.
SPI / CPISchedule and Cost Performance Index. Earned value divided by planned value, and earned value divided by actual cost.
Total floatThe time that an activity can slip before it delays the project finish
ViewpointA saved view: the date, the camera, the sections and the color mode
WidgetOne chart, table or number on a dashboard
XERThe export file format of Primavera P6